Norwegian heavy water sabotage Simple English Wikipedia, the free encyclopedia
In the first, quantities of the fissionable isotope uranium-235 (U-235) would need to be separated from the much more common isotope U-238 sufficient to assemble a so-called super-critical mass. In a last act of sabotage, a Norwegian team led by one of the Gunnerside commandos sank the ferry transporting the remaining heavy water on February 20, 1944, although at the cost of 14 Norwegian civilians. Because the room was so far underground and the walls were so thick, there was hardly any noise when the bombs went off, allowing the whole team to escape before the Germans found out what had happened. The team evacuated and waited for the explosion. Explosives were set in the target room, which was in the basement.
Unable to find any other way in, they had decided to risk a noisy break-in. Although it was a steep climb, they crossed the ravine without incident and managed to get to the railway line. Democracy prevailed, and a retreat via the ravine was agreed. Helberg discovered that it was indeed possible to descend into the ravine, cross the frozen river Måna at the bottom and ascend the other side, where the saboteurs could access a railway line cut into the mountainside. But what had been considered impossible by the German defenders was considered quite feasible by the Norwegian attackers. Helberg was dispatched to Rjukan to source information on the Vemork defences from a contact in the town, an engineer at the plant called Rolf Sørlie.
The mission’s success, however, was not a final blow to the Germans’ heavy water production. The explosion apparently was not as loud as expected, but nonetheless, Rønneberg heard it and knew the mission was a success. In the first stage of the mission, a small scout team of Norwegians codenamed Grouse parachuted from a plane and landed in the surrounding area of the plant to gather intelligence and prepare for the attack group. The British were rather familiar with wartime sabotage; the country had a secret unit called the Special Operations Executive (SOE). Although these commandos did not know the significance of their sabotage at the time, they later learned that their mission played a part in hindering Germany’s atomic bomb program.
After a couple of days’ recuperation, the Norwegians were ready to mount their attack. The mission was delayed again on 23 January 1943, when the RAF pilot and navigator failed to find the designated drop zone and, running low on fuel, turned around and headed back to base. ‘None of us had been to the plant in our lives but by the time we left Britain we knew the layout of it as well as anyone,’ said Rønneberg. This time, the SOE had the advantage of Brun’s intimate knowledge of the plant. No quarter was to be granted to saboteurs, on principle, even if they were in uniform at the time of their capture. Both gliders and one of the Halifax bombers used to tow them crashed.
The bombs destroyed the machines and stopped the station from making heavy water. The commandos set bombs on the machines that made the heavy water. Even though the Norwegian commandos were able to hide from the Germans, the mission was a complete failure. The paratroopers were flown in on gliders pulled by large bombers. On 19 November 1942, British paratroopers were supposed to meet the Norwegian commandos and attack the power station. The mission went well and the commandos began surveillance of the power station from Hardanger Plateau.
During wartime, time is of the essence and any kind of setback has disadvantages. At the very least, Operation Gunnerside should be recognized as one of the most successful SOE missions during World War II. In his memoirs, Albert Speer recalled that “on the suggestion of the nuclear physicists we scuttled the project to develop an atom bomb by the autumn of 1942” (p. 227). In a similar vein, historical evidence shows that the Germans had actually slowed investment in their atomic bomb program by the time of the operation. There were four German and fourteen Norwegian casualties from the explosion. Led by Knut Haukelid, a group of Norwegian saboteurs was ordered to sink a ferry carrying the Germans’ semi-finished heavy water products to research centers in Germany.
They began their retreat back along the railway line, and then back down the ravine. The saboteurs left by a cellar door, and were no more than twenty metres from the building when they heard a muffled explosion. By his reckoning, they should be able to get to the second floor before the explosion.
First, if the bombs hit the liquid-ammonia storage tanks at the plant’s chemical complex, the civilian population in Rjukan was at risk. Although bombing the plant was favored by the American military, the British opted to run an SOE-sponsored mission based on Tronstad’s guidance. For their knowledge of the plant, land, and climate, the British turned to Tronstad and Company Linge to stop the Germans’ heavy water production background reading at Vemork.
They loaded the railroad cars on a ferry called the SF Hydro. This time, the Norwegian commandos were able to sneak up to the power station and attacked it. The attacks started in February 1942 by Norwegian Commandos and Allied bombers. The target of the missions was the 60 megawatt Vemork power station.
